In the same period, HHLA in Germany, DP WORLD in Dubai and Buenaventura Port in Colombia signed new port machine orders with the company. HHLA's CTB terminal has purchased 5 double-lifting bridges. The equipment is difficult to design and has a tight manufacturing cycle. It is scheduled to be delivered in May 2013. DP WORLD's London Gateway Terminal will be awarded in November this year. After the company's 8 shore bridges, the company again awarded the company three rail crane contracts, which will be delivered to users by the end of 2013; Sociedad Portuaria Regional of Buenaventura, Colombia has ordered 2 shore bridges, and TECSA has purchased 6 tires. Hanging, two batches of equipment will be delivered to Columbia Port in March 2013.
Alloy Pump Head Hydraulic Diaphragm Metering Pump
* Both manual control and digital control for 4-20mA is available.
* Double diaphragm design with diaphragm rupture alarm system.
* Double or triple pump heads is available.
* The flow can be adjusted from 0-100% while it's running or stopped.
* Hydraulic actuated Diaphragm Metering Pump, no leakage.
*With the design of inner changeable release safety valve and limited auto-compensation valve.
* Diaphragm material: PTFE
Alloy Pump Head Hydraulic Diaphragm Metering Pump,Big Alloy Pump Head Hydraulic Diaphragm Metering Pump,Small Alloy Pump Head Hydraulic Diaphragm Metering Pump
Zhejiang Ailipu Technology Co., LTD. , https://www.alipu.com